SSA : Nigeria : Hitech Construction Company Ltd.

Name of company Hitech Construction Company Ltd.

Address

8th Floor Plot 1682 Sanusi Fafunwa Street Victoria Island, Lagos, Nigeria

Phone

+ 234 (1) 461 6867

Fax

+234 (1) 461 6867
website www.hitech-company.com

Contact Mail

info@hitech-company.com

Sector

 

Introduction

Established in 1988, Hitech is currently one of the leading Building & Civil Engineering Contractors in Nigeria. In addition to headquarters offices in Lagos, we have regional offices located in Abuja, Port Harcourt and Bayelsa.

The combination of on-site professional management and office-based engineering, design and planning staff, equipped with advanced computerised facilities, has enabled Hitech to maintain itself in the forefront of Construction and Engineering Technology in Nigeria.

Ever ready to innovate and introduce proven developments in design and material technology, Hitech is able to undertake a multitude of Civil Engineering/Building Projects and have adequate facilities for the construction of:

• Roadworks, Bridges, Drainage & Concrete Structures
• Land Reclamation, River Canalization & Dredging
• Dams, Water Supply, Irrigation Schemes & Shoreline Protection
• Airport runways and infrastructure
• Demolition

In order to provide logistical support to ongoing projects, Hitech maintains a substantial fleet of heavy-duty construction plant and equipment in addition to numerous haulage vehicles sufficient to supply the material requirements of sites regardless of distance or location.

The substantive and diverse nature of the fleet has enabled Hitech to undertake projects of a magnitude beyond the capabilities of other contractors. A typical example is the bulk excavation and associated earthworks project for Nigerian Breweries in Enugu requiring 220,000 cubic meters of earth to be excavated, transported, deposited and compacted in place within a 3 month period.

Additional facilities include operational granite quarries located at Ibadan (north of Lagos) and Calabar. Asphalt Plants are also located in Ibadan and Lagos for all road surface requirements.

Finally in the pursuit of delivering a quality product Hitech completed in 1998 the installation of a pre-stressed concrete factory in Abuja utilising state of the art equipment supplied by Pourtrelles-Precontraine-Beton of France. The factory commenced production in September 1998 and is capable of producing bridge beams, piles, structural elements, lighting poles and similar products for the construction and allied industries.

By means of structured expansion of resources in addition to the timely adoption of innovative technology Hitech intend to maintain its prominent position in the Nigerian Construction Industry and extend operations internationally.

Vision Statement

To become an internationally recognized construction company delivering quality engineering solutions.

Mission Statement

  • To provide professional, quality and technologically advanced products on schedule and within budget,
  • to meet all requirements of our client, and
  • to constantly endeavour to maintain and improve our standards of work.
Services and Expertise

Hitech specializes in roads construction and land development. Its main target is to make sure to give you the best quality and long-life services. With its huge fleet of machines, Hitech is qualified to achieve the most difficult and complicated road works. It always ensures its asphalt work is of the highest quality. With its mix design, asphalt plant and brand new paving machines, Hitech provides one with the best quality of asphalt surfacing and also provides an excellent quality of concrete works.

Brief Summary of Selected Hitech Projects

Eko Akete Development

The Eko Akete Development Project is an infrastructural development of a portion of land located along the Lekki-Epe Expressway. The land measures approximately 380 hectares.

Scope of work:

The initial scope of work as contained in the original master plan for the project consists of the following:

• 15.8km asphaltic concrete dual carriageway
• 38km asphaltic concrete secondary roads
• 66km concrete drain network
• 191,380 square meters landscaping and garden areas
• 380 hectares of bush clearing
• Perimeter walling with gates and entrances

Demolition of Bank of Industry

Hitech has been appointed by the State Ministry of Physical Planning and Urban Development, in partnership with the State Ministry of Works and Infrastructure, as the lead contractor to demolish the partially collapsed Bank of Industry Building (BOI), Broad Street, Marina. This project is a first of its kind in Nigeria and demolition was performed by use of controlled implosion.

The acts of demolishing the BOI structure were accomplished by the use of both conventional and implosive methods respectively. The conventional method as usual involved the use of manual labour and mechanical machines. Non-load bearing walls were demolished manually with the use sledge hammers and diggers. The implosive methods entail the use of explosives installed in drilled holes round the lift shaft and in specified columns. Progressive collapse was adopted in order to ensure that the structure fell in the right direction and to avoid any damage to surrounding structures. Other preparatory activities included:

  • Installation of wire-mesh fence to demarcate site
  • Installation of geotextile scaffolding to protect surrounding buildings
  • Assistance in pre-weakening of structures (drilling)

Dualization of Adetokunbo Ademola Street

Hitech has been appointed by the Ministry of Works and Infrastructure to upgrade the Adetokunbo Ademola Street in Victoria Island. The project was undertaken in two phases.

The dualization of Adetokunbo Ademola Street Phase 1 (Bar Beach side to Ajose Adeogun roundabout) and Phase 2 (Ajose Adeogun roundabout to intersection with Lekki-Epe Expressway) included the following deliverables:

• Widened road to accommodate dual carriageway traffic
• Interlocking paving stone surfacing
• Kerbstones
• Median landscaping
• Road markings
• Excavation and clearing
• Layerworks, including stone-base
• Concrete kerbs (pre-cast)
• Culvert extensions
• Street lights
• Paving stones
• Manholes for electrical services

Alimosho Local Government Area Infrastructure Development

Hitech has been awarded various contracts in the Alimosho Local Government Area as part of a strategic approach by the State Ministry of Works and Infrastructure to upgrade infrastructure and services in this region. The projects are summarised in two phases and are currently ongoing.

Construction of Ekoro Road

Scope of work: 4.8km asphalt overlay of entire road with an average width of 12.30 meters. Construction of stone base, side drains, kerbs, concrete walkway and lay-by.

Construction of Agodo Community Roads

Scope of work: 4.6 km asphalt overlay of road of 8.50 meters average width including construction of stone base, side kerbs; side drains and concrete walkway.

Construction of Shasha – Orisumbare – Ejigbo Road

Scope of work: A 4.0 km asphalt road average 9.00 meters wide including construction of stone base, side kerbs; side drains and concrete walkway.

Construction of Association Avenue

Construction of Agodo Community Roads

Scope of work: 4.6 km asphalt overlay of road of 8.50 meters average width including construction of stone base, side kerbs; side drains and concrete walkway.

Construction of Shasha – Orisumbare – Ejigbo Road

Scope of work: A 4.0 km asphalt road average 9.00 meters wide including construction of stone base, side kerbs; side drains and concrete walkway.

Construction of Association Avenue

Scope of work: 2.60 km single carriage asphalt road average 10.00 m wide including construction of stone base, side kerbs, side drains and concrete walk way.

Construction of Isheri Deck-on-Pile

Scope of work: 1 km length of deck on pile bridges at two locations (from CH 2+870 to 3+837 and from CH 4+943 to 5+383) along the same route.

Bar Beach Shoreline Protection

The Bar Beach Shoreline Protection project was executed in two phases. This project is a highly successful attempt in protecting the shoreline and preventing flooding in along the coastal area in Victoria Island. Both phases have been completed.

  • Production and placing of x-blocks (concrete)
  • Placing of geotextile to receive x-blocks
  • Spreading of sand, levelling, grading and compaction
  • Casting of walkways (concrete)
  • Placing of rocks (at x-blocks and between walkway levels)
  • Casting of parking areas (concrete)
  • Median landscaping
  • Minor road repairs and asphalting

Osborne Jetty and Terminal Building

The scope of work of this project includes the construction of an intermodal interchange at Osborne, inclusive of parking areas, internal roads, a terminal building and jetties. The project is currently in design stage. The geotechnical investigation has been completed recently.

Maroko Access Road

The Maroko Access Road is a contract awarded by the State Ministry of Works and Infrastructure. This road will play an important role in the efficiency of the Lekki-Epe Expressway, by providing access to this expressway in the vicinity of the first toll plaza.

Lekki-Epe Expressway

The Expansion of the Lekki-Epe Expressway is a Public Private Partnership. The scope of work include the expansion, upgrading and rehabilitation of a 49.6km road. Structures on this project include the widening of 3 bridges, the construction of 7 pedestrian bridges, the construction of an on-ramp to Falomo Bridge, the construction of boundary walls to all adjacent properties as well as the construction of 3 toll plazas.

This infrastructure development project is a first of its kind in Nigeria. Work is being done according to international standards and the quality requirements are stringent. In addition to Hitech, various role-players are working together to ensure the successful execution of this high profile project. Following the finalization of the Financial Close during the last quarter of 2008, work is currently ongoing at various locations.

See also:

Interview with Mr. Ibrahim Ibrahim, Managing Director...read more!

 

 
World Investment News - The Very First Investment News Company on the Web

 

 

Make World Investment News Your Homepage.
© 2011 World INvestment NEws
Disclaimer | Site Map |  Web Mail |