Oil & Gas

Delattre Bezons Nigeria is a local construction company in the Oil & Gas Industry in Nigeria.
Established in 1978, the company has since participated in the development of major Oil & Gas projects in the country.
Two permanent base facilities operate in the heart of the oil industry in Port Harcourt and Warri.
A dedicated Project Base is located in Bonny. The Head Office is in Lagos.
Known as DBN, the company, over the years has become a major local joint venture partner for international EPC
contractors in Nigeria.

Delattre Bezons was incorporated in Nigeria in the year 1978.
The Company is registered with the Department of Petroleum Resources to operate as an Oil Industry Service Company, Special Category.

QHSE Policy
Our Corporate Policy stipulates :
Customer orientation, Leadership, Process approach &
Continual Development with respect to Quality, Health, Safety & Environment

"Safe Attitude, Quality Work Culture & Environmental Protectionare Three Pillars
For our Success "

Quality Management System
Certification Dbn Is Certified ISO 9001:2008
BY BVC.

Parent Company
Entrepose Contracting France is DBN’s Parent Company. Entrepose has been a leading international Oil & Gas EPC Contractor for the past four decades.
DBN has sister Companies in the UK, Algeria and France.

Presentation

Delattre Bezons was established in Nigeria in 1978 and in 1987, became a Subsidiary of the 70 years old company Entrepose, known today as Entrepose Contracting.
Entrepose Contracting is recognised as one of the most reputed EPC Contractors in the Oil & Gas industry.
Delattre Bezons Nigeria permanent pre-fabrication yards are situated in Port Harcourt and Warri, and the Head Office is in Victoria Island – Lagos.

Site Locations
Two permanent base facilities operate in the heart of the Oil industry in Port Harcourt and Warri.
A dedicated Project Base is located in Bonny.
The Head Office is in LAGOS.

Warri
DBN owns a construction yard in Warri that is situated on River front side on the Express way.
The Total area is 32 000 m² and has:

• 250 m² of office space,
• 170 m of marine facilities (jetty and slipway),
• 1800 m² of Pre-fabrication Workshops

Warri Yard has water front access with Marine facility comprising of Jetty and Slipway.
This jetty is used for transporting material to various sites in CNL facilities.
In 2005, DBN carried out Benin River Flow Station repairs project when the Flow Station was berthed in DBN jetty and the entire Job was carried out in
DBN Warri yard.

Pre-fabrication Workshops:
Two Pre-fabrication Workshops having covered area of 1800 m² with crane facilities are available.
These workshops can undertake Piping & Structural pre-fabrication works.

Construction Equipments:
Warri yard maintains an array of construction equipment which are deployed to various Project Sites as and when required.

The yard has 250 m² of office space which can accommodate up to thirty (30) people with with computers loaded with the latest versions of software and a dedicated mail server and Internet
connectivity.
It also has local and international voice and fax communication facilities.

Port Harcourt

Port Harcourt facilities are used as the Operations Centre for all In- Country activities.
Situated at Trans Amadi Industrial Layout, the area of 23,000 Sq.m. includes 560 Sq.m. Offices and 1,500
Sq.m. of covered space as Steel Prefabrication
Workshops, Mechanic, Sand-Blasting and Painting.

DBN facilities in Port Harcourt operates as the centre for all In-country construction activities. Situated at Trans Amadi industrial Layout, and 23 000 sq is stretching over 23,000 sq.m self contained with sophisticated Office’s, prefabrication work shops, covered space,
HSE training centre, sand blasting, painting, stores, mechanic work shop, fuel station, warehouse and vehicle park.

Construction Equipments

Port Harcourt yard maintain an array of construction equipment which are deployed to various Project Sites as and when required.
Full list of DBN Construction Equipment shall be available on request.

Office facilities:
Apart from the facilities mentioned above, 515 sq m of office space is available.
These offices are fully equipped with airconditioning,
computer network, e-mail & internet facilities, local and international voice and fax communications,
rediographic services and vehicle park.
It also has local and international voice and fax communication facilities.

Core Business

DBN's Core Business is traditionally focused around the activities of the Oil & Gas Industry.

- Storage Tanks
- Plant Construction
- Tam
- Pipelines
- Services
- Energy
- Heavy Lifting Operation
- Scaffoldings

Storage Tanks

Delattre Bezons Nigeria is recognized among the most reliable local contractors in the domain of construction and rehabilitation/revamping of Storage Tanks.
DBN’s references include the following Tank types :

• Floating Roof
• Conical Roof
• Refrigerated
• Spherical Fixed Roof
• Sphere
• Cryogenic
Also
• Tank Farm
• Tank Rehabilitation
• Tank Revamping

Plant Construction
As the local partner, DBN has participated in the realisation of major Oil & Gas EPC Contracts in Nigeria in association with its parent Company Entrepose Contracting.

TAM
With its involvement in major TAM & Rehabilitation Projects in the Country for the past ten years, DBN is considered as a TAM Specialist Contractor for Refineries periodic Maintenance Shutdown programme, including FCCU Specialised equipments are permanently available in Nigeria as well as
Supervisors and Specialists in the following range of activities

• Static
• Rotating
• Electrical & Instrumentation
• Refractory
• Piping
• Heavy Lifting
• Scaffolding

Pipelines
Pipeline Projects are amongst DBN's traditional core business activities.

Services
The Services activity of DBN is based in Port Harcourt.
It involves a dedicated permanent team of Steel Erectors, Carbon Steel Welders as well as certified Duplex Welders, Erectors, Electrical & Instrumentation Specialists, Scaffolders, Mechanics, Compressor Specialists and Workshop facilities.
Services include Maintenance, Minor Works to Onshore and Offshore Oil & Gas installations and also Supply of Personnel and Equipment Offshore Current main Contract references are Total Epnl at Port Harcourt and Chevron at Escravos.

Heavy Lifting Operation
DBN has long, recognised experience of Heavy Lifting Operations.
The Company owns a wide range of cranes including a 200 tons mobile telescopic crane.

Scaffoldings
DBN maintains a stock of 150 tons of scaffolding materials permanently available for its operations throughout the Country.

Our Clients and Partners

Nigerian National Petroleum Corporation
Shell
Total
Chevron
Exxon Mobil
Technip
Nigeria Lng Ltd.
Agip
Entrepose Contracting

Our References

Obiafu Orikom Gas Plant
EPC Contract for an LPG Plant for the production of de-methanized NGL as feed stock to Eleme Petrochemical Complex
The cryogenic process included :

• Two 2.7 MW Turbo Expenders
• Two MW Centrifugal Booster
Compressors
• Two 1.7 MW Refrigerator
Compressors
• One Gas Turbine
• Electrical & Instrumentation
Period of execution : 1990 to 1993
DBN was the local partner of Entrepose Contracting
DBN’s Contract value 10 MUSD (out of a total contract value of 37 MUSD)

Bonny Island
Storage Tank Maintenance Project Complete Refurbishment of twelve floating-roof crude oil storage tanks of a capacity of 400,000 cum each.
DBN was the local contracting partner of Entrepose Contracting.
Period of execution : 1990 to 1996. DBN’s contract value : 9 MUSD (out of a total contract value of 27 MUSD)

NNPC Eleme Petrochemical Project Design, procurement, fabrication and ti f 12 h f it erection of spheres of capacity ranging from 1000 to 4500 cum, 18
storage tanks with capacities of 1,500 to 55,000 cum, and a 12,000 cum ethylene tank DBN was the local Sub-Contractor for Chiyoda. Period of execution: 1991 to 1993 DBN’s Contract value 10 MUSD (out of a total contract value of 32 MUSD)

Qua Iboe Terminal
EPC Contract for a new crude treatment process, to enable the plant capacity double and storage extension.
DBN’s scope included installation of a gas power plant, 80,000 cum floating roof tank, piping, electrical and instrumentation works Period of execution 1992 to 1994.
DBN’s Contract value 7 MUSD

LPG Extraction Unit EPC Contract at Escravos
Engineering, Procurement, Construction & Commissioning of a new LPG extraction unit at Escravos, Delta State.
The gas plant has a production capacity of 7,000 BLPD of propane and butane.
DBN was the local contractor of the JV formed by ABB Randall and Entrepose Contracting.
Engineering and procurement was carried out by ABB Randall while construction was under the scope of Entrepose Contracting and DBN.
DBN Works contained Piling (1,200), Civil Work, Structures & Piping prefabrication in DBN’s Warri yard and erection, construction of 3 tanks and 4 spheres (1,200 cum), installation of fire-fighting system, Electrical and Instrumentation.
DBN’s contract value was 9 MUSD (out of a total Project Cost of 75 MUSD)
Year of realisation : 1995 to 1997

BONNY Cryogenic Tank Storage facilities LNG Unit

EPC Contract for 2 LNG 85,000 cum Tanks, 1 Sphere of 1,200 cum, 16 atmospheric Tanks (1,000 to 40,000 cum)
DBN was the local contractor for Entrepose Contracting.
Period of execution : 1995 to 1999
DBN’s contract value : 11 MUSD (out of a total contract value of 98 MUSD)

Turn Around Maintenance & Rehabilitation Works Of The Nnpc Refinery In Kaduna
Project Description : Rehabilitation and Maintenance Works of the Refinery during production shutdown. Total PLC Nigeria was the Consultant, Entrepose Contracting the Main Contractor and DBN the
local partner for the supervision and execution of the Works.
DBN’s Scope contains :

• Replacement of heat exchangers & re-tubing
• Refurbishment of the FCCU
• RefractoryWorks (600 tons)
• Refurbishment of 5 Boilers
• Refurbishment of 200 pumps
• Refurbishment of two 14MW turbo-generators
• Refurbishment of 10 turbo compressors
• Electrical – Instrumentation (1,200 Nos.)

Procurement and Engineering and Project Management was realised by Entrepose Contracting
No. of Man Hours : 1.5 Millions,
period 1998-1999
DBN’s Contract Value : 18 MUSD (out of a total Project Cost of 60 MUSD)

Forcados
Storage Tanks Maintenance Project Complete Refurbishment of 4 floating roof crude oil Storage Tanks of a capacity of 100,000 cum each and 2
Utility Tanks.
DBN was the local partner for Entrepose Contracting
Period of execution : 1998 to 2000
DBN’s Contract Value : 7 MUSD (out of 20 MUSD total contract value)

Belemagas Plant Project
Engineering, Procurement, Construction & Commissioning of a Gas Plant to gather and treat the associated gas of 4 Oil Flow
Stations before delivery to the Soku Gas Treatment Plant and then to the Bonny Island LNG Plant.
Capacity : 3.5 M cum / day
Period of execution : 1999 - 2001
DBN was the local contractor of the JV formed by ABB Lumus and Entrepose.
2.8 million man-hours was achieved without LTI together with good Community relations. No major disturbances and no significant incident occurred.
DBN’s contract value : 15 MUSD (out of 160 MUSD total Contract Value)

225 MW Thermal Power Plant
Egbin Power Barges Ltd, Lagos Installation of a 225 MW (9x25) Barge Power Plant at Egbin.
DBN was the local contractor for Entrepose Contracting
DBN’s Scope included barge unit mooring, gas system works, demineralisation deionisation units, water system, 5,000 cum tank and Balance of Plant.
DBN’s contract value : 8 MUSD (out of a total contract value of 22 MUSD)
Period of realisation : 2000 - 2001

Turnaroundmaintenance & Rahabilitation Works At The Warri Nnpc Refinery
Rehabilitation and Maintenance Works of the Refinery during production shutdown DBN, as the local contractor for
Entrepose Contracting, was responsible for the total maintenance and rehabilitation works, including :

• FCCU
• PPU
• Rotating
• Static
• Electrical & Instrumentation

Period of execution : 2002 – 2004
2.5M man-hours without LTI and no major incident with Host Community.
DBN’s Contract value : 12 MUSD out of a Total Contract value of 55 MUSD

Rehabilitationworks At Nnpc Kaduna Refinery
EPC Contracts for the Rehabilitation of four Units of the Refinery

• FCCU
• Black Start Unit
• Raw Water Intake System Rotating
• Waste Water Unit

Period of Execution : 2003 – 2005
DBN was the local partner for Entrepose Contracting
DBN’s Contract value 6 MUSD (out of a total contract value of 18 MUSD)

CNL – Benin River Flow Station Repairs Project
Complete rehabilitation of Benin River Flow Station comprising of Piping, Mechanical, Structural, Electrical & istrumentation works at DBN Warri yard.
Period of execution - Jan’05 to May’05
Contract value - 1.5 MUSD

NLNG Train 6 Osbl Project
Location: Bonny Island
Project Scope: Engineering, Procurement and Construction of
• 1 x 85 000 m3 LNG Tank
• 2 x 65 000 m3 LPG Tanks
• 1 x 36 000 FR Condensate Tank
Period of Execution : 2004 – 2008
DBN was the local partner for Entrepose Contracting
DBN’s Contract value 75 M € (out of a total contract value of 220 M €)

NLNG Train 6 ASI Project Balance Of Plant
Location: Bonny Island
Project Scope: Engineering, Procurement and Construction of
• Instrument Air Unit
• Nitrogen Unit
• Amine Oxidizer Unit
• Condensate Stabilisation Unit
• 132 KV Network Integration
Period of Execution : 2005 – 2009
All units except 132 KV Network Integration completed.
DBN is the local partner for Entrepose Contracting
DBN’s Contract value 50 M € (out of a total contract value of 147 M €)

CNL Offshore Construction Crew &
Equipment Contract

Supply of Offshore construction Crew and Equipment for carrying out various Maintenance & Hook-up
works in CNL Offshore Production Platforms.
Period of execution - 2005 to 2008
Contract Value - 7 MUSD

Mobil – East Area Project
Post start up Activities
Scope of work: Provision of Construction Crew & Equipment for
•Waste Heat recovery Unit Piping
installation
• Repair of the Mole Sieves
• Exhaust Stacks extension and supports
installation
Period of execution – June’07 to Oct’07
Contract value - 2 M USD

AKPO FPSO
Scope of Work:
Piping – Structural – Mechanical Hook-up works and Commissioning assistance.
Period of execution - Oct’08 to June’09
Contract value - 10.5 MUSD

Port Harcourt Base
Fax : 262 38 80 or 01 461 8378
Delattre Bezons Nigeria (DBN)
Plot 107 Trans-Amadi Layout,
Port Harcourt.
Tel : 084 238 837 or 084 232 320
Fax : 084 238 017 or 084 232 502

Warri Base
Delattre Bezons Nigeria (Dbn)
Km 5, Npa Expressway
(Besides Chevron Texaco)
Warri - Delta State.
Tel : 053 320 427
Fax : 053 320 427

 

 

 

 
World Investment News - The Very First Investment News Company on the Web

 

 

Make World Investment News Your Homepage.
© 2011 World INvestment NEws
Disclaimer | Site Map |  Web Mail |