1986JV formed as ALCIM - Société Algérienne de Cimentation 1987Pumping Operations Started 1989Start Cementing Services 1990Launched Coiled Tubing and N2 Operations 1993Company starts services for International oil companies Agip + Total 1996Company renamed BJSP 1997Revenue exceeds $25 million 1998Revenue exceeds $30 million Investment in new equipment and facilities 1999Sandstone AcidSM introduced to Hassi R'Mel
BJSP ConformStimSM Water Conformance Study
Development of BJSP Lite
Roto-JetTMtechnology introduced
CEMENTING EXPERIENCE
Sonatrach
>150 wells since 1989
Total
2 exploration wells - 1991/1992
Agip
>25 wells, exploration and development since 1993
LL&E
>20 wells, exploration and development
Anadarko
>18 wells from 1995 - 1998
Cepsa
>13 wells from 1995 - 1998
INC
>9 each large bore water wells since 1996
Mobil
4 exporation wells from 1995 - 1998
2 exploration wells in 2000
Encor
3 exploration wells in 1994
Alepco
2 wells in 1994
BHP
2 exploration wells in 1994
Veba
1 exploration well in 1995
Arco
2 exploration wells in 1997-98
Phillips
2 exploration wells in 1997-98
Wascana
1 well in 1997
Plus Petrol
1 well in 1997
CTU/N2/STIMULATION EXPRIENCE
Year
Operator and Project Location
Type of Job
1986 - Present
Sonatrach: all regions
Coiled Tubing NitrogenMatrix acidizingPumping
1993 - Present
Agip: Blocks 403, 440
Coiled TubingNitrogenPumping
1994 - Present
Burlington Resources (LL&E)
NitrogenPumping
1995 - Present
Cepsa: Block 406a
Coiled TubingNitrogenPumping
1995 - 1998
Mobil: Block 433
NitrogenCoiled TubingPumping
1996 - Present
Anadarko: Blocks 404, 208
Coiled TubingNitrogenPumping
1998 - 1999
BP In Salah
Coiled TubingNitrogen
PUMPING EQUIPMENT
· 7 each Model 118 Twin Cementers with PSM
· 2 each Model 138 Twin Cementers
· 1 each RAM Unit
· 4 each Model 118 Twin Acid Pumpers
· 2 each Model 131 Single Acid Pumpers
BJSP units are equipped with Pacemaker pumps rated 10,000 psi with max rate up to 16.7 bpm (2.66 m3/h). All cement Units are equipped with BJ's Precision Slurry Mixer PSM, providing homogeneous cement slurries at densities ranging from 8 to 20 lb/gal (0.96 - 2.40). The 3305 Mini monitor is used for real time monitoring and recording of job parameters.
COILED TUBING EQUIPMENT
· 2 ea 1-1/4" CT Units - HR 125
· 2 ea 1-1/2" CT Units - HR 240 & HR 440
· 1 ea 2" Unit - S800
· 1 ea 1-3/4" CT Unit w/ Mast. Can be fitted with 2-7/8" tubing
· 1 ea 1-1/2" CT Unit
COILED TUBING TECHNOLOGY
Now Available:
· Milling
· Fishing
· Roto-JetTM
· Data MapTM
On request: ·DUCTTM- Drilling Using Coiled Tubing ·Phase Separator · Straddle Packer ·Sand-VacTM- Concentric Coil Tubing
CEMENTING TECHNOLOGY
BJSP Lite TM
· Developed in Hassi Messaoud Laboratory
·Eliminates the need for a stage collage saving rig time
·Has good compressive strength and light hydrostatic column
Magne Plus TM
· 100% acid soluble cement. Solution to reservoir invasion
RAM TMCementing Technology Liquid Stone TM Para-bow TM
FEATURES OF LIQUID STONETM
As a storage mix
· Behaves like mud
As an activated slurry
·Behaves like conventional cement slurry ·Covers all normal BHCT's up to 230 C ·Rheology can be thinned with dispersant · Controllable Fluid loss (30-150ml/30 min) · Can be extended to 1.32 SG ·Can be weighed to 2.40 SG ·Thickening time controllable from 1-24 hrs ·Compatible with all conventional additives
As a set cement
· Develops normal levels of compressive strength
Major Benefits of Liquid Stone
· Eliminates uncertainty
· Better quality control
· Uniform mixing
· Perfect density control
· Less equipment on location
· Simpler equipment
· No pneumatics
· Improved logistics
· Reduced waste
· Environmentally friendly
Liquid Stone Case Histories
· Over 100 jobs have been pumped successfully since the introduction in 1996, onshore and offshore
· Far East, Europe
· 3-500 bbl slurry volume
· BHST 2 - 200 C
· 1.6 - 1.9 SG
Conventional Applications
Quality and Accurate Density
· Plugs
· Sqeezes
· Coiled Tubing Jobs
· Slimhole
· HTHP
· Primary cement
Liquid StoneTMHow is it done?
· Conventional Cement / blend
· "Put to sleep" Chemically
· Stored as SG 1.9 Premix
· "Woken up" with activator
· batch mix or mix "on-the-fly"
· sets up as a normal cement
STIMULATION TECHNOLOGY
Sandstone AcidSM
ConformStimSM Water Conformance
Polymer Specific EnzymesTM
Modern Acid Mixing Plant
·Built with HSE - QA concerns in mind ·Increased Operational Safety ·Environmentally Friendly · Improved Mixing Quality · Computer Controlled Mixing Process with Manual Override · Post Mixing Report
OPERATIONS SUPPORT
Cement Bulk Storage and Transport:
·22 each 60 tonne skid mounted silos ·6 each 90 tonne skid mounted silos ·2 each 40 tonne skid mounted silos ·7 each Bulk Trailer transport
Nitrogen Transport:
· 5 each 27 cubic meters Trailers
Acid Mixing and Transport:
·12 compartmented trailer mounted transport tanks and a new modern acid mixing plant